Jetties Terminal & Offshore Structures | .
Piling works to support the jetty structure. Installation of two nos. mooring buoys Tank Farm consisting of: One 6,000 m 3 fixed roof kerosene, one 6,000 m3 floating-roof gasoline tank, three 2,000 m 3 fixed-roof tanks for untreated ballast water and two fixed-roof tanks 800 m 3 and 300 m 3 for storage or recovered oil and diesel respectively.